Trusted Remodeling Services Near You

ADU Addition in Del Mar, CA

ADU Addition in Del Mar, CA
Petra Arts Construction

ADU Addition in Del Mar, CA

Accessory Dwelling Units (ADUs) are an excellent way to expand your living space, generate rental income, or provide a private area for guests or family. Petra Arts Construction specializes in ADU additions in Del Mar. We design and build ADUs that combine style, functionality, and compliance with local building codes.

From concept to completion, our team handles everything — permits, design, and construction — ensuring a smooth process from start to finish.

 

What We Do:

  • Design & Planning: Custom layouts tailored to your property, needs, and local zoning requirements.
  • Full Construction: From foundations to finishes — handled entirely in-house for quality control.
  • Utility Integration: Electrical, plumbing, HVAC, septic or sewer as needed, and solar-ready systems installed efficiently.
  • Permitting & Compliance: We handle all required permits and ensure your ADU meets California standards.
  • Finishing & aesthetics: flooring, fixtures, doors, windows, matching the style of your primary home.
  • Exterior integration: making sure the ADU blends with your home’s appearance, landscaping, and street appeal.

Accessory Dwelling Units — ADU Addition

Why Choose Us For ADU Additions in Del Mar, CA:

We understand every detail — from lot configuration to city approvals. Our team manages your ADU project with precision, ensuring functionality, beauty, and long-term value.

  • Boost property value and potential rental income
  • Added privacy for guests, family, or as a home office/studio
  • Supports housing density goals, often with benefit programs or streamlined regulations in San Diego
  • Efficient use of existing land
Gallery

Our Work

What Clients Are Saying

Testimonials

Weather in Del Mar, CA

Clear Sky

thermostat

64°F

Temperature

air

6mph

Wind Speed

humidity_mid

45%

Humidity

About Del Mar, CA

Although the 17th Amendment was not passed until 1913, some states elected their Senators directly before its passage. Oregon pioneered direct election and experimented with different measures over several years until it succeeded in 1907. Soon after, Nebraska followed suit and laid the foundation for other states to adopt measures reflecting the people's will. By 1912, as many as 29 states elected senators either as nominees of their party's primary or in conjunction with a general election.

Map of Del Mar, CA

Estimate & Timeline:

We start with a free consultation and property assessment to plan your ADU project. Most builds take 3–6 months, depending on size and permits. Our team handles the entire permit process while ensuring full compliance with San Diego’s ADU regulations, including lot size, setbacks, height limits, and safety codes.